Tuesday, February 7, 2012
Progress
Monday, September 26, 2011
Shop walls (aka Shipping Containers) in place
Towing chains hooked around the forks and the container
Sunday, September 18, 2011
Quick connects & farmhouse demo begins!
Several of our new implements have the quick on/off. We had to retro-fit the bucket and several of the older implements.
Wednesday, December 8, 2010
It begins for real
Tuesday, October 26, 2010
Progress!
Big tree behind the house is gone!
Note the stump - it feels so open now
Some of the Black Walnut logs - future ReAdapted projects?
Additionally, we met with a local electrical contractor who is going to take down all of our overhead electrical lines and bury them. The timing works well since soon (hopefully) next week, the excavator is coming to excavate around the house, excavate the new home site, berm up areas to direct watershed from the back hill and install another culvert to direct water away from the homesite. Although we don’t envision starting construction for another two years, we need to know and understand how this watershed re-direction is going to work before we build a new house.
Bury those overhead lines - some of them are bare wire
close up of the spruce stump
Spruce tops
13 ft lengths; one is 38" and clear
with the chain saw for scale (obviously, this chain saw wasn't used to cut them down!)
We also got a pallet full of framing materials delivered for the barn while we were there. We are moving ahead full-steam to try to frame and pour concrete footings and reinforcements before it gets too cold this fall. Bill built about ½ of the frames needed for the buttresses and the back wall framing.
Pile of the frames
We hope to go back either the 1st or 2nd week of Nov for an extended period. The clock is ticking on the weather and our concrete pour window is getting smaller every day.
Monday, December 14, 2009
Future Farmhouse

The smaller building on the left is the current house which we are repurposing into a studio, office, commercial kitchen and garage.
The building on the right is the newer one. They are connected by a breezeway. Passive solar and solar heated radiant floors are in the house, the breezeway and the commercial kitchen.
The new building is 24' x 30'.
Wednesday, December 9, 2009
Jobs and finances
In other news, our farm class focused on a $10,000 farm start up last week. It was sobering. In the study we did (egg layers - which are of course not really a money maker) showed how little money the farmer made.
I'm also reading a case study published by Center for Integrated Agriculture Systems and the finances are just astoundingly poor, to be frank. Market gardeners with less than 3 acres in vegetable production (not including cover crops) make on average $4.96 per hour. This report is from late 2005 so maybe money has gotten better...? Here is a link to the study: Grower to Grower: Creating a livelihood on a fresh market vegetable farm. I haven't read the whole study yet, but I look forward to delving into it further. I need to really do some self-reflection to determine whether I can mentally be OK with working that hard for less than minimum wage. Lots to consider.
Wednesday, August 5, 2009
Storm and melt water management
We were at the farm this past weekend. If you follow the white fence on the right - see the part that is partially fallen down? It is now totally down. Grant County received 2" of rain in one hour and we had a pretty severe water backup. You can see across the driveway from the part of the fence that is falling down there is a culvert. It is too small, partially crushed on both sides and leads to water backup. The water collects on the right into a big pond which flows over the driveway and then has lots of momentum and force. It isn't in this picture but there was a footbridge over this seasonal creek further to the left. The planks were rotten and we were planning on taking it down anyway - it washed away it is further down the creek near the house.
It was great to see because we need to engineer our way out of this. We also had water flow down the hill behind the house. The grass near the house is all flattened and there was silt at the front door. Water in the cellar too. Bad sign. We are actually rethinking our original plans for the house - as much as I hate to admit it. We are considering turning the house into a garage/summer kitchen/art studio (upstairs) and building a new house connected to the old house (which will now be the garage) by a breezeway.
I have been struggling with this. Bill and I always rehab old buildings. We had done three of them to date - and this one was supposed to be our grande finale! I have been dreaming of rehabbing an old farmhouse for years and giving new life, energy efficiency and another 100 years to an old house.
However, by building new... we could build a small 2 bedroom home that could perhaps be passive solar. Lots to consider.
Sunday, March 15, 2009
Saturday work
little cottage (the old church - I'll do some posts on it soon) and we were tired but felt a good sense of accomplishment. We are definitely on our way now.